| 14/10/2019 - 31/12/2019 »» page 5/5 «« | ...continued from the previous page | 74. day - 26/12/2019 - Port side engine tasks:
- Put back heat exchanger, generator, air intake box etc.
- Replace starter relay
- Install raw water pump
- Replace all cooling hoses
- Install waterlock (new exhaust hose)
- Fill with fresh coolant mix
- Replace gearbox oil
- Install shaft coupling from SBD engine and align engine
- Install Volvo seal and flexible coupling
Starboard side engine tasks:
- Replace oil cooler hoses (2X)
- Put back heat exchanger, generator, air intake box etc.
- Install raw water pump
- Replace all cooling hoses
- Install waterlock (new exhaust hose)
- Fill with fresh coolant mix
- Replace gearbox oil
- Align engine then remove shaft coupling
- New alternator V belt
- Clean cranksshaft V belt pulley | 78. day - 30/12/2019 - . | 79. day - 31/12/2019 - . | 80. day - 01/01/2020 - . | 82. day - 03/01/2020 - English translation is missing, sorry.... | 85. day - 06/01/2020 - English translation is missing, sorry.... | 86. day - 07/01/2020 - . | 87. day - 08/01/2020 - English translation is missing, sorry.... | 88. day - 09/01/2020 - English translation is missing, sorry.... | | | |
|